The Adams Construction Company is bidding on a project to install alarge flood drainage culvert from Dandridge to a distantlake. The cost and benefits
are shown below. Use the Present Worth conventional and modified Benefit-Cost ration method to make a recommendation.Draw Cash Flow Diagram
Initial investment = $2 million
Right of way maintenance cost = $30,000 per year
Major upkeep every six years = $50,000
Annual benefits to the taxpayers = $135,000 per year
Life of the project = 12 years
MARR = 6%
In: Finance
Sales Mix and Margin of Safety
Northwest Technology Inc. manufactures and sells two products, digital game players and computer tablets. The fixed costs are $936,000, and the sales mix is 70% game players and 30% computer tablets. The unit selling price and the unit variable cost for each product are as follows:
| Products | Unit Selling Price | Unit Variable Cost | |||||
| Game players | $ 50 | $30 | |||||
| Tablets | 120 | 80 | |||||
Assume that 31,500 units of digital game players and 13,500 computer tablets were sold in the current year. Assuming no change in the sales mix, determine the following for Northwest Technology Inc. Round to one decimal place.
1. Margin of safety for game players expressed as (a) units sold, (b) sales dollars, and (c) a percentage.
| (a) Units sold | |||
| (b) Sales dollars | $ | ||
| (c) A percentage. | % |
2. Margin of safety for tablets expressed as (a) units sold, (b) sales dollars, and (c) a percentage.
| (a) Units sold | |||
| (b) Sales dollars | $ | ||
| (c) A percentage. | % |
3. Margin of safety for total sales expressed as (a) units sold, (b) sales dollars, and (c) a percentage.
| (a) Units sold | |||
| (b) Sales dollars | $ | ||
| (c) A percentage. | % |
In: Accounting
Hau Lee? Furniture, Inc., spends
45?%
of its sales dollars in the supply chain and finds its current profit of
?$35,000
inadequate. The bank is insisting on an improved profit picture prior to approval of a loan for some new equipment. Hau would like to improve the profit line to
?$40,000
so he can obtain the? bank's approval for the loan.
|
Current Situation |
|
|
Sales |
?$140,000 |
|
Cost of material |
?$63,000 ?(45?%) |
|
Production costs |
?$28,000 ?(20?%) |
|
Fixed cost |
?$14,000 ?(10?%) |
|
Profit |
?$35,000 ?(25?%) |
?a) What percentage improvement is needed in the supply chain strategy for profit to improve to
?$40,000??
What is the cost of material with a
?$40,000
?profit?
A decrease of
7.94?%
in material? (supply-chain) costs is required to yield a profit of
?$40,000?,
for a new material cost of
?$58000.
?(Enter your response for the percentage decrease to one decimal place and enter your response for the new material cost as a whole? number.)
?b) What percentage improvement is needed in the sales strategy for profit to improve to
?$40,000??
What must sales be for profit to improve to
?$40,000??
An increase of
in sales is required to yield a profit of
?$40,000?,
for a new new level of sales of
?(Enter your response for the percentage increase to one decimal place and enter your response for the new sales as a whole?number.)
In: Operations Management
By considering the genotypes in a single generation (NOT changes in frequencies over time or changes from one generation to the next), how would you show that natural selection is occurring in the Near-Lethal Homozygote (near-lethal recessive) simulation (Hint: think about Hardy-Weinberg Equilibrium).
In: Biology
The City of Calgary is considering the construction of a new high school in order to accommodate a growing population. Before they proceed, they would like to conduct a Benefit/Cost analysis using different time horizons and interest rates. An economist for the City has tabulated the following benefits and costs in the table below.
|
Building costs (design, planning and construction) |
$9,000,000 |
|
Land costs |
1,000,000 |
|
Initial cost for roads and parking facilities |
5,000,000 |
|
Initial cost for parking facilities |
500,000 |
|
Initial cost to furnish and equip building |
500,000 |
|
Annual operating and maintenance costs |
650,000 |
|
Annual savings from busing students |
300,000 |
|
Annual benefits to community* |
1,600,000 |
|
Estimated annual cost of congestion |
100,000 |
|
Estimated annual cost due to loss of property values |
300,000 |
*This value was estimated by a City survey. The survey asked people their willingness to pay for a high school in their neighbourhood.
a) Calculate the NPV with interest rates of 3 percent, 5 percent
and 8 percent and with time horizons at 30 and 60 years. Comment on
how different interest rates and time horizons affect the economic
value of this public project.
(Note: Show your calculation for one NPV. You do not need to show
them for each one)
b) For someone working on the Calgary School Board, (a Spender) what interest and time horizon would they be promoting?
In: Finance
How has sustainable construction materials changed the construction industry?
In: Civil Engineering
In: Statistics and Probability
Kristopher Company has budgeted sales of $300,000 with the following budgeted costs:
Direct materials $60,000
Direct manufacturing labor 40,000
Factory overhead
Variable 30,000
Fixed 50,000
Selling and administrative expenses
Variable 20,000
Fixed 30,000
Required (10 points):
Compute the average markup percentage for setting prices as a percentage of:
In: Accounting
1. What are the suitable type of Excavations required to remove the layer of fine grained soil with a high clay content soil directly beneath the topsoil? Moreover, it is observed from the building design that foundations shall be constructed nearby to each other. In line with the requirements, recommend the safe and sustainable type of excavation along with the construction plant team suitable to construction site situation?
2. What is the suitable type of Foundation to build a G+3 storey building transforms heavy loads to the ground and it is desired to have minimum settlement? The building will be built in a fine grained soil with a high clay content soil, and the construction site is a residential area which may contain obstructions, and consists of adjacent structures and the construction method of foundation shall not develop any ground heave.
According to the ground stability and site circumstances, propose the most desirable construction method of the foundation and construction plant.
3. What are the suitable type of Super Structure for constructing G+3 residential buildings?
Considering this, recommend the most desirable, safe and sustainable construction method for the super structure based on the most common form of construction in Al Mabelah area In Sultanate of Oman.
In: Civil Engineering
In: Computer Science