Questions
A truck acquired at a cost of $260,000 has an estimated residual value of $12,550, has...

A truck acquired at a cost of $260,000 has an estimated residual value of $12,550, has an estimated useful life of 49,000 miles, and was driven 3,900 miles during the year. Determine the following. If required, round your answer for the depreciation rate to two decimal places.

(a) The depreciable cost $
(b) The depreciation rate $ per mile
(c) The units-of-activity depreciation for the year $

In: Accounting

Why are satellites normally sent into orbit by firing them in an easterly direction? Based on...

Why are satellites normally sent into orbit by firing them in an easterly direction? Based on this, explain why the International Space Station (ISS) orbits the Earth at about 17,500 miles per hour at an altitude above Earth’s surface of about 230 miles. Would it be more efficient to have a higher or lower orbit for the ISS? Explain in detail why or why not.

In: Physics

Question 1 The Highway Safety Department wants to study the driving habits of individuals. A sample...

Question 1
The Highway Safety Department wants to study the driving habits of individuals. A sample of 41
cars traveling on the highway revealed an average speed of 60 miles per hour and a standard
deviation of 7 miles per hour. The population of car speeds is approximately normally distributed.
Determine a 90% confidence interval estimate for the speed of all cars.

In: Statistics and Probability

A study of a disease reveals that there is an average of 1 case every 22...

A study of a disease reveals that there is an average of 1 case every 22 square miles. Residents of a town that has an area of 10 square miles are concerned because there are two cases in their area. The state’s Department of Health has decided to investigate further if the probability of getting two or more cases in this town is less than 0.05. Does the Department of Health investigate further?

In: Statistics and Probability

Write a program that calculates the occupancy rate for a hotel. The program should start by asking the user how many floors the hotel has.

Use JAVA

Program #1: Hotel Occupancy: Write a program that calculates the occupancy rate for a hotel. The program should start by asking the user how many floors the hotel has. A for loop should then iterate once for each floor. In each iteration of the for loop, the program should ask the user for the number of rooms of the floor and how many of them are occupied. After all of the iterations are complete the program should display how many rooms the hotel has, how many of them are occupied, and the percentage of rooms that are occupied.

It is traditional that most hotels do not have a 13thfloor. The for loop in this program should skip the entire thirteenth loop iteration.

Input validation: Do not accept a value of less than one for the number of floors. Do not accept a value of less than 10 for the number of rooms on a floor. Do not accept a value for occupied that is greater than rooms.

EXAMPLE INPUT TO USE FOR TESTING (just an example your program should work for all different inputs):

If the Number of Floors in the Hotel: 16

And the user to INPUT the following information for total rooms and occupied rooms:

Floor #

Total Rooms

Occupied Rooms

1

200

180

2

170

100

3

50

20

4

125

125

5

100

80

6

200

80

7

80

40

8

90

45

9

95

0

10

115

103

11

125

17

12

140

128

14

130

129

15

100

99

16

60

24

The output of your program for the above example should be (do NOT print the above chart!):

The Hotel has 1780 Total Rooms.

1170 of the Rooms are Occupied.

66 % of the Rooms are Occupied.

Program #2: Pennies: For the first day worked a person earns $1.00 for the entire day. For the second day worked the person’s daily pay is doubled to $2.00. For the third day worked the person’s daily pay is doubled again to $4.00. For each consecutive day a person works their daily pay is doubled in this way.

Write a program that asks a user to enter the number of days they worked and then calculates the pay they earned for each day along with the total pay they earned for all of the days.   The program output should be the pay for each day and the total pay earned for all the days.

Input Validation: Do not let the user enter a number of days that is less than 1. Use a loop to prompt them to enter another number for the number of days if they enter a number that is less than 1.

Make sure and format your output.

Example: This would be the output for a person who worked 4 days

Pay for Day 1: $1.00
Pay for Day 2: $2.00
Pay for Day 3: $4.00
Pay for Day 4: $8.00

TOTAL PAY FOR 4 DAYS: $15.00

In: Computer Science

Case – Recreational Park Project The public has recognized the benefits of recreation and parks as...

Case – Recreational Park Project
The public has recognized the benefits of recreation and parks as essential to their health and quality of life. A recent survey conducted in 2016 found that the construction of more recreational facilities was a top priority among residents in Lazarette Town (in the Caribbean).
As such, the town council in Lazarette, with the help of other key stakeholders, has sourced and secured three (3) million dollars of grant funds from the Caribbean Wellness Community (CWC) for the development of a mini outdoor recreational park on three (3) acres of land donated by a benevolent resident of the town.   
The park will contain sporting facilities among other recreational facilities (e.g. walking trails, children playground, tennis court, basketball court, work out stations, benches, shower facilities, rest rooms etc.). All major key stakeholders and sponsors have unanimously agreed that that the facility should cater for residents of all ages. Additionally, a group of minority stakeholders has expressed their requirements of having an eco-friendly and climate resilient facility. The park should be completed and ready for use by 2022, i.e. the project duration should not exceed two years.
To ensure that the project is completed on time, within scope and on budget, the funding agency and the Lazarette Town Council require that a dedicated and knowledgeable project team is assigned to the project. CWC has expressed the need for the project deliverables to be of ‘high’ quality to guarantee stakeholders’ satisfaction and safety. The CWC requires that ‘tight’ procurement processes should be followed to ensure transparency, accountability and economy. It is anticipated that most of the goods, works and services for building the park will be procured from vendors, suppliers and contractors in the town. In addition, CWC has detailed the need for both positive and negative projects risk to be properly managed throughout the project.
In response to CWC implied and expressed requirements, the Lazarette Town Council has selected and appointed your team to provide project management services for the Recreational Park Project. As a proactive team, your team has decided to use ‘best practices’ in project management to plan project activities and get approval from key project stakeholders before constructing or building the facility. Give the type and nature of the project, the intention is to use a traditional/waterfall approach to project management activities instead of the largely popular and contemporary agile methodology used other industries.   
Your team understands the value of planning before doing, and the council’s concerns of not losing the grant funding from CWC. In addition, your team is keen on building a good reputation in the
town. With a can do attitude and the need to increase the chances of the project success, the project management team (your 5-member group) is determined to ensure that the team utilizes the ‘best practices’ for planning, executing and controlling this valuable community based project.

1.Develop a quality management plan to consist of quality management approach,quality requirements and standard,quality assurance,quality control and quality control measures.

In: Operations Management

Case – Recreational Park Project The public has recognized the benefits of recreation and parks as...

Case – Recreational Park Project

The public has recognized the benefits of recreation and parks as essential to their health and quality of life. A recent survey conducted in 2016 found that the construction of more recreational facilities was a top priority among residents in Lazarette Town (in the Caribbean).

As such, the town council in Lazarette, with the help of other key stakeholders, has sourced and secured three (3) million dollars of grant funds from the Caribbean Wellness Community (CWC) for the development of a mini outdoor recreational park on three (3) acres of land donated by a benevolent resident of the town.

The park will contain sporting facilities among other recreational facilities (e.g. walking trails, children playground, tennis court, basketball court, work out stations, benches, shower facilities, rest rooms etc.). All major key stakeholders and sponsors have unanimously agreed that that the facility should cater for residents of all ages. Additionally, a group of minority stakeholders has expressed their requirements of having an eco-friendly and climate resilient facility. The park should be completed and ready for use by 2022, i.e. the project duration should not exceed two years.

To ensure that the project is completed on time, within scope and on budget, the funding agency and the Lazarette Town Council require that a dedicated and knowledgeable project team is assigned to the project. CWC has expressed the need for the project deliverables to be of ‘high’ quality to guarantee stakeholders’ satisfaction and safety. The CWC requires that ‘tight’ procurement processes should be followed to ensure transparency, accountability and economy. It is anticipated that most of the goods, works and services for building the park will be procured from vendors, suppliers and contractors in the town. In addition, CWC has detailed the need for both positive and negative projects risk to be properly managed throughout the project.

In response to CWC implied and expressed requirements, the Lazarette Town Council has selected and appointed your team to provide project management services for the Recreational Park Project. As a proactive team, your team has decided to use ‘best practices’ in project management to plan project activities and get approval from key project stakeholders before constructing or building the facility. Give the type and nature of the project, the intention is to use a traditional/waterfall approach to project management activities instead of the largely popular and contemporary agile methodology used other industries.

Your team understands the value of planning before doing, and the council’s concerns of not losing the grant funding from CWC. In addition, your team is keen on building a good reputation in the

town. With a can do attitude and the need to increase the chances of the project success, the project management team (your 5-member group) is determined to ensure that the team utilizes the ‘best practices’ for planning, executing and controlling this valuable community based project.

1. Justify the need to effectively manage quality for the project.

In: Operations Management

Case – Recreational Park Project The public has recognized the benefits of recreation and parks as...

Case – Recreational Park Project

The public has recognized the benefits of recreation and parks as essential to their health and quality of life. A recent survey conducted in 2016 found that the construction of more recreational facilities was a top priority among residents in Lazarette Town (in the Caribbean).

As such, the town council in Lazarette, with the help of other key stakeholders, has sourced and secured three (3) million dollars of grant funds from the Caribbean Wellness Community (CWC) for the development of a mini outdoor recreational park on three (3) acres of land donated by a benevolent resident of the town.

The park will contain sporting facilities among other recreational facilities (e.g. walking trails, children playground, tennis court, basketball court, work out stations, benches, shower facilities, rest rooms etc.). All major key stakeholders and sponsors have unanimously agreed that that the facility should cater for residents of all ages. Additionally, a group of minority stakeholders has expressed their requirements of having an eco-friendly and climate resilient facility. The park should be completed and ready for use by 2022, i.e. the project duration should not exceed two years.

To ensure that the project is completed on time, within scope and on budget, the funding agency and the Lazarette Town Council require that a dedicated and knowledgeable project team is assigned to the project. CWC has expressed the need for the project deliverables to be of ‘high’ quality to guarantee stakeholders’ satisfaction and safety. The CWC requires that ‘tight’ procurement processes should be followed to ensure transparency, accountability and economy. It is anticipated that most of the goods, works and services for building the park will be procured from vendors, suppliers and contractors in the town. In addition, CWC has detailed the need for both positive and negative projects risk to be properly managed throughout the project.

In response to CWC implied and expressed requirements, the Lazarette Town Council has selected and appointed your team to provide project management services for the Recreational Park Project. As a proactive team, your team has decided to use ‘best practices’ in project management to plan project activities and get approval from key project stakeholders before constructing or building the facility. Give the type and nature of the project, the intention is to use a traditional/waterfall approach to project management activities instead of the largely popular and contemporary agile methodology used other industries.

Your team understands the value of planning before doing, and the council’s concerns of not losing the grant funding from CWC. In addition, your team is keen on building a good reputation in the

town. With a can do attitude and the need to increase the chances of the project success, the project management team (your 5-member group) is determined to ensure that the team utilizes the ‘best practices’ for planning, executing and controlling this valuable community based project.

1. Create an appropriate quality management plan for the project.

In: Operations Management

Recreational Park Project The public has recognized the benefits of recreation and parks as essential to...

Recreational Park Project
The public has recognized the benefits of recreation and parks as essential to their health and quality of life. A recent survey conducted in 2016 found that the construction of more recreational facilities was a top priority among residents in Lazarette Town (in the Caribbean).
As such, the town council in Lazarette, with the help of other key stakeholders, has sourced and secured three (3) million dollars of grant funds from the Caribbean Wellness Community (CWC) for the development of a mini outdoor recreational park on three (3) acres of land donated by a benevolent resident of the town.   
The park will contain sporting facilities among other recreational facilities (e.g. walking trails, children playground, tennis court, basketball court, work out stations, benches, shower facilities, rest rooms etc.). All major key stakeholders and sponsors have unanimously agreed that that the facility should cater for residents of all ages. Additionally, a group of minority stakeholders has expressed their requirements of having an eco-friendly and climate resilient facility. The park should be completed and ready for use by 2022, i.e. the project duration should not exceed two years.
To ensure that the project is completed on time, within scope and on budget, the funding agency and the Lazarette Town Council require that a dedicated and knowledgeable project team is assigned to the project. CWC has expressed the need for the project deliverables to be of ‘high’ quality to guarantee stakeholders’ satisfaction and safety. The CWC requires that ‘tight’ procurement processes should be followed to ensure transparency, accountability and economy. It is anticipated that most of the goods, works and services for building the park will be procured from vendors, suppliers and contractors in the town. In addition, CWC has detailed the need for both positive and negative projects risk to be properly managed throughout the project.
In response to CWC implied and expressed requirements, the Lazarette Town Council has selected and appointed your team to provide project management services for the Recreational Park Project. As a proactive team, your team has decided to use ‘best practices’ in project management to plan project activities and get approval from key project stakeholders before constructing or building the facility. Give the type and nature of the project, the intention is to use a traditional/waterfall approach to project management activities instead of the largely popular and contemporary agile methodology used other industries.   
Your team understands the value of planning before doing, and the council’s concerns of not losing the grant funding from CWC. In addition, your team is keen on building a good reputation in the
town. With a can do attitude and the need to increase the chances of the project success, the project management team (your 5-member group) is determined to ensure that the team utilizes the ‘best practices’ for planning, executing and controlling this valuable community based project.

1. Create an appropriate quality management plan for the project.

2. Justify the need to effectively manage quality for the project.

In: Operations Management

Does the eccentricity of the orbit increase or decrease as you shorten the initial distance of...

Does the eccentricity of the orbit increase or decrease as you shorten the initial distance of the planet from the star? Why would this be the case? (Based on my data the eccentricity of orbit decreased with shorter initial distances between the planet and star. Please explain why that is. Data is shown below)

Trial

Initial distance (thousand miles)

d (thousand miles)

c (thousand miles)

T (days)

Ti2/T02 di2/d02 eccentricity

0

91500

186000

185950

365

0.02

1

75000

128045

126422

210

0.331

0.326

0.16

2

62384

96656

91582

136

0.139

0.140

0.30

3

5000

69009

62203

83

0.052

0.051

0.43

In: Physics