REVENUE RECOGNITION
If you sign up for and receive a new phone that would normally
retail for $500 (cost to manufacture $380). We commit to a three
year contract where we will have to pay back an amount that starts
at $600 (to pay for the phone) but drops each month until it
reaches zero at the end of 3 years (kind of like financing for the
phone). We pay an activation fee of $35 along with the first month
of service that will be $70 each month for the next 36 months.
After one year of service, we will be eligible for $100 off the
latest phone if we trade in the one year old phone for a new one.
That rises to $200 after two years.
Show all journal entries needed to show revenue recognition.
In: Accounting
I. Proof of an assertion regarding a proportion:
1. The municipal government of a city uses two methods to register properties. The first requires the owner to go in person. The second allows registration by mail. A sample of 50 of the method I was taken, and 5 errors were found. In a sample of 75 of method II, 10 errors were found. Test at a significance level of .15 that the personal method produces fewer errors than the mail method.
2. A pharmaceutical firm is testing two components to regulate the pressure. The components were administered to two groups. In group I, 71 of 100 patients managed to control their pressure. In group II, 58 of 90 patients achieved the same. The company wants to prove at a level of significance of .05 that there is no difference in the effectiveness of the two drugs.
In: Math
42. You are working as an assistant to an air-traffic controller at the local airport, from which small airplanes take off and land. Your job is to make sure that airplanes are not closer to each other than a minimum safe separation distance of 2.00 km. You observe two small aircraft on your radar screen, out over the ocean surface. The first is at altitude 800 m above the surface, horizontal distance 19.2 km, and 25.08 south of west. The second aircraft is at altitude 1 100 m, horizontal distance 17.6 km, and 20.08 south of west. Your supervisor is concerned that the two aircraft are too close together and asks for a separation distance for the two airplanes. (Place the x axis west, the y axis south, and the z axis vertical.)
In: Physics
GreenGrass is a manufacturer of lawnmowers. GreenGrass needs 40 pounds of aluminum to manufacture one lawnmower, and there is maximum 2,000 pounds available per month (you cannot store more). The manufacturing cost is $1,200 per unit during the first month, and $1,500 during the second month. Your cost of holding 1 lawnmower in inventory is estimated at $100 per month. You have to meet a demand of 30 lawnmowers in month 1, and 60 lawnmowers in month 2. In addition, GreenGrass’ plant manager wants to produce at least 20 units per month.
GreenGrass would like to minimize its total cost while meeting demand. Formulate this problem as a linear program. By following the 4 steps, write out the linear model. (25 pts.)
In: Operations Management
Ram Roy's firm has developed the following supply, demand, cost, and inventory data.
|
Supply Available |
||||
|
Period |
Regular Time |
Overtime |
Subcontract |
Demand Forecast |
|
1 |
40 |
15 |
10 |
50 |
|
2 |
35 |
15 |
10 |
60 |
|
3 |
30 |
20 |
10 |
50 |
|
Initial inventory |
30 units |
|
Regular-time cost per unit |
$100 |
|
Overtime cost per unit |
$150 |
|
Subcontract cost per unit |
$200 |
|
Carrying cost per unit per month |
$4 |
Assume that the initial inventory has no holding cost in the first period and backorders are not permitted.
Allocating production capacity to meet demand at a minimum cost using the transportation method, the total cost is $__ (enter your response as a whole number).
In: Operations Management
I need new and unique answers, please. (Use your own words, don't copy and paste), Please Use your keyboard (Don't use handwriting) Thank you...
Question 2: [2.5 Points]
For each of the following design goals, assign into its corresponding category (Quality Attributes).
In: Computer Science
Programming assignment (100 pts): In the C++ programming language write a program capable of playing Tic-Tac-Toe against the user. Your program should use OOP concepts in its design. You can use ASCII art to generate and display the 3x3 playing board. The program should randomly decide who goes first computer or user. Your program should know and inform the user if an illegal move was made (cell already occupied). The program should also announce if one of the players wins or if a draw is achieved. While it is desirable for your program to play a strong game, this is not an Artificial Intelligence course so if your program does not play at a world champion level you will not be penalized for it.
I've been looking at other post for this question and nothing is working.
In: Computer Science
In: Computer Science
I need to implement a code in python to guess a random number. The number must be an integer between 1 and 50 inclusive, using the module random function randint. The user will have four options to guess the number. For each one of the failed attempts, the program it should let the user know whether is with a lower or higher number and how many tries they have left. If the user guess the number, the program must congratulate the user and tell him how much he won. If you are a user, hit on the 1st attempt He wins first $ 100, on the second $ 75, on the third $ 50, on the fourth $ 25. If the user misses all four opportunities, the program must inform the user that he owes money $ 60 and what was the number that the computer generates randomly.
In: Computer Science
Ram Roy's firm has developed the following supply, demand, cost, and inventory data.
|
Supply Available |
||||
|
Period |
Regular Time |
Overtime |
Subcontract |
Demand Forecast |
|
1 |
40 |
15 |
5 |
40 |
|
2 |
30 |
15 |
5 |
55 |
|
3 |
40 |
15 |
5 |
55 |
|
Initial inventory |
20 units |
|
Regular-time cost per unit |
$100 |
|
Overtime cost per unit |
$150 |
|
Subcontract cost per unit |
$200 |
|
Carrying cost per unit per month |
$4 |
Assume that the initial inventory has no holding cost in the first period and backorders are not permitted.
Allocating production capacity to meet demand at a minimum cost using the transportation method, the total cost is?
(enter your response as a whole number).
In: Operations Management